Costing Grid

Description of Costs Bid Amount Paid Amount Subcontractor or Supplier
A. Miscellaneous Costs      
1. Lot Cost      
2. Arch & Eng Fee      
3. Surveyor      
4. Other Misc Costs      
5.      
6.      
7.      
B. General Costs      
1. Permits      
2. Insurance, Warranties      
3. Inspections      
4. Temporary Facilities      
5. Supervision      
6. Overhead      
7. Profit      
8. Clean-Up      
9.      
10.      

 
Description of Costs Bid Amount Paid Amount Subcontractor or Supplier
C. Site Work      
1. Septic System      
2. Excavation & Backfill      
3. Off-Sites      
4. Hardscape & Driveways-Framing      
5. Landscape      
6. Demolition      
7. Irrigation      
8. Driveway      
9.      
10.      
D. Concrete      
1. Footings & Foundations      
2. Floor Slabs      
3. Structural Concrete      
4.      
E. Masonry      
1. Unit Masonry      
2. Masonry Veneer      
3.      
4.      
5.      
6.      

 
Description of Costs Bid Amount Paid Amount Subcontractor or Supplier
F. Metals      
1. Structural Metal Framing      
2. Structural Steel      
3. Miscellaneous Metal      
4.      
5.      
G. Carpentry      
1. Framing Lumber      
2. Rough Carpentry      
3. Mill Work      
4. Finish Carpentry      
5. Cabinets & Counters      
6. Log Package      
7.      
H. Thermal/Moisture      
1. Flashing      
2. Vapor Barrier      
3. Gutters & Downspouts      
4. Water & Damp Proofing      
5. Insulation      
6. Roofing      
7. Exterior Wall Finish      
8. Sealants & Caulking      
9.      

 
Description of Costs Bid Amount Paid Amount Subcontractor or Supplier
I. Doors, Windows, Glass      
1. Windows      
2. Interior Doors & Frames      
3. Exterior Doors & Frames      
4. Garage Doors      
5. Glass & Glazing      
6. Finish Hardware      
7.      
J. Finishes      
1. Painting-Interior      
2. Painting-Exterior      
3. Gypsum Board      
4. Lath & Plaster      
5. Wall Coverings      
6. Floor Coverings      
7. Tile      
8.      
9.      
K. Specialties      
1. Fireplace      
2. Fire Sprinkler System      
3.      
4.      
5.      

 
Description of Costs Bid Amount Paid Amount Subcontractor or Supplier
L. Equipment      
1. Appliances      
2. Other      
3.      
4.      
5.      
6.      
7.      
M. Special Construction      
1. Outbuildings      
2. Special Purpose Rooms      
3. Swimming Pool & Spa      
4. Saunas      
5.      
6.      
7.      
8.      
9.      

 
Description of Costs Bid Amount Paid Amount Subcontractor or Supplier
N. Mechanical      
1. Sewer & Water      
2. Well      
3. Rough Plumbing      
4. Plumbing Fixtures      
5. Plumbing Finish      
6. HVAC-Underground      
7. HVAC-Rough In      
8. HVAC-Equipment      
9. HVAC-Final      
10.      
11.      
O. Electrical      
1. Electrical-Services Entrance      
2. Electrical-Rough In      
3. Electrical-Load Controller      
4. Electrical-Fixtures      
5. Electrical-Finish      
6. Alarm System & Low Voltage      
7.      
8.      
P. System Built Package      
1. Materials Package      
2. Freight Charges      
3.      
Q. Financing      
1. Closing Costs (Construction Loan)      
2. Interest Reserve (if applicable)      
3.      
Line Item Grand Total